Infrastructure Development

The City of Tulsa has recently adopted a new, streamlined, Infrastructure Development Process. With the enactment of Title 35, this new process encourages economic development in a logical, efficient, and progressive manner. We recognize that the economic viability of commercial and residential development depends on timely completion of all phases of the project. In that regard, we have significantly reduced the amount of administrative paperwork and shortened the time required to get construction underway. We hope that you will find the City of Tulsa to be great place for your development and will share our enthusiasm for "A New Kind of Energy!"

Guidance Letters

Letter to ContractorLetter to EngineerResidential Drainage Guidance LetterAnnual Contracts Update LetterIDP Plans Submittal Guidance Letter

Infrastructure Development Process

IDP Manual (pdf)IDP Process Summary
Top Ten Submittal Problems

Lists of current Engineers and Contractors able to do IDP work within the City of Tulsa

Current IDP Approved Engineers (Updated 2/1/2012) Current IDP Approved Contractors (Updated 2/1/2012)

Checklists

Infrastructure Development Process (IDP) Checklist

Plat Checklist - Subdivision Regulations - INCOG (11.09 MB)

Stormwater Pollution Plans Review Checklist ( pdf) ( Word)

Plat Covenants

Plat Covenants

Stormwater Management

1993 Stormwater Management Criteria Manual

Forms for Major Infrastructure Development Process:

Contractors

Application for Contractor's Annual ContractContractor's Annual ContractAnnual Right of Way bond - ArterialAnnual Right of Way bond - Non-ArterialTwo Year Major Construction Maintenance BondApplication for Major Construction Right of Way Permit

Developers

Application for Developer's ContractDeveloper's ContractAcknowledgement FormApplication For Formal Acceptance

Engineers

Application for Engineer's Annual Contract Contract for Annual Engineering ServicesApplication for Predevelopment MeetingApplication for IDP Plan ReviewApplication for Plan RevisionApplication for Easement Submittal

Sanitary Sewer Blank Bid Proposal (optional)
PDFWord
Water Blank Bid Proposal (optional)
PDFWord


Application for Minor Watershed/Minor Construction Permit:

(To be applied for through the Permit Center)

Watershed Permit Application