Change Order No. 1 to Contract No. 138068 between the City of Tulsa and Crossland Heavy Contractors, Inc. for Project No. 2036N1153Z in the amount of twenty-eight thousand, five hundred thirty dollars and forty-five cents ($28,530.45), and adding one hundred twenty (120) calendar days necessary for the addition of waterline materials needed for design change, 2" air relief valve - 4 total, 6" x 6" Dl Cross (RJ), two (2) additional long services, 6" Dl plug, removal of a large diameter tree breaking roadway and sidewalk. (CD-2) [PW 6/24/26; CC 7/15/26]