311

Construction Bids

It is the intent of the City of Tulsa to make available information regarding Public Improvement Projects to all interested parties. Construction Projects for the City of Tulsa are advertised publicly through the Tulsa World every Friday for six business days unless specified otherwise and through the Oklahoma Eagle. Other sources of receiving project information can be found through the Plan Rooms listed below.

The City of Tulsa requires General / Prime Contractors to be Prequalified according to Title 11 Chapter 11 of the City of Tulsa Ordinances. If not clearly stated in the Notice to Bidders, prequalifications are not required. Prequalified Contractors must carry at least one of the following prequalifications:

A - General 
B - Building Construction
C - Paving and Bridge Construction
D - Utility Construction
S - General / Specialty Classification

All General / Prime Contractors must be bonded. Please download information regarding the prequalification process.

 

2017 Schedule

Sealed bids are received every Friday by 8:30 a.m. at the City Clerk's Office, 175 East 2nd Street, Room 260. Bids are opened publicly on Friday mornings at 9 a.m. in the City Council Chambers of the new City Hall. Bids received more than 96 hours before the time set for opening of bids will not be considered. It is the bidders responsibility to verify and acknowledge receipt of all addenda for contract documents. The City of Tulsa reserves the right to decline the  responsibility of verification. Addenda information can be obtained by calling (918) 596-9249 or (918) 596-9406.

Requirements for submitting bids can be found in the Instructions to Bidders of the Contract/Bidding Documents.

City of Tulsa Bid Documents can be viewed at the following Plan Room locations:

Southwest Construction News
7170 South Braden Avenue, Suite 180
Tulsa, OK 74136

Bid News
5727 South Garnett Road, Suite H
Tulsa, OK 74146

 

Copies of the Bid Documents can be picked up at 2317 South Jackson, Room N108, Tulsa, OK. for the cost of $50. The payment type by check or money order, should be made payable to City of Tulsa; if bidding documents are shipped the deposit should be mailed to 2317 S. Jackson, Rm. N103, Tulsa, Oklahoma 74107. For further details or questions regarding bidding jobs through the City of Tulsa contact:

City of Tulsa
Contract Administration
(918) 596-9249 phone
(918) 596-1299 fax


Bids Received 11-03-17

Plans Available: Yes ($50)

TMUA ES 2014-18 SANITARY SEWER AREAWIDE POINT REPAIR PROJECT

OWRB LOAN NO. FAP-13-0007-L

A Mandatory Pre-Bid is scheduled for Monday October 16, 2017 at 9 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: N/A
Pre-Qualifications: A and D

Electronic Proposal | Drawings | Pre-bid Attendee | Addendum No. 1 | Addendum No. 2 | Revised Electronic Proposal |


Bids Received 11-17-17

Plans Available: Yes ($50)

TMUA-W 16-41 AB JEWELL MAINTENANCE & STORAGE BUILDING

Mandatory Pre-Bid is scheduled for Monday October 23, 2017 at 9 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: N/A
Pre-Qualifications: A, B, and S

Electronic Proposal | Drawings | Tech Specifications | Pre-Bid Attendee |


146110 IMPROVE OUR TULSA POLICE ACADEMY RENOVATIONS

A  Mandatory Pre-Bid is scheduled for Monday October 23, 2017 at 9:30 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: 6-10%
Pre-Qualifications: A and B

Electronic Proposal | Drawings | Tech Specifications | Pre-Bid Attendee | Addendum No. 1Rev Electronic Proposal | Addendum No. 2 |


2017-MPO (C5)R ARTERIAL STREET MAINTENANCE CITYWIDE

A  Mandatory Pre-Bid is scheduled for Tuesday October 24, 2017 at 9 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: 6-10%
Pre-Qualifications: A and C

Electronic Proposal | Pre-Bid Attendee | Addendum No. 1 |


TMUA-W 15-52  MOHAWK WATER TREATMENT PLANT RAW WATER ELECTRICAL IMPROVEMENTS

A  Mandatory Pre-Bid is scheduled for Tuesday October 31, 2017 at 9:30 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: N/A
Pre-Qualifications: A and D

Electronic Proposal | Drawings | Pre-bid Attendee | Addendum No. 1 |


Bids Received 12-1-17

144104-G ARTERIAL STREET REHABILITATION FOR RIVERSIDE DRIVE-24TH STREET TO 35TH STREET TRAIL IMPROVEMENTS

A  Mandatory Pre-Bid is scheduled for Tuesday November 7, 2017 at 9 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: N/A
Pre-Qualifications: A and C

Electronic Proposal | Drawings |Pre-Bid Attendee |


163120-1, TMUA-W 17-76 HAIKEY CREEK- 91ST STREET DRAINAGE IMPROVEMENTS

A  Mandatory Pre-Bid is scheduled for Monday November 6, 2017 at 9 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: 6-10%
Pre-Qualifications: A and C

Electronic Proposal | Drawings | Pre-Bid Attendee |


144157 & TMUA-W 14-49, NON ARTERIAL STREET REHABILITATION MAINTENANCE ZONE 1157N

A  Mandatory Pre-Bid is scheduled for Monday November 13, 2017 at 9:30 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: 6-10%
Pre-Qualifications: A, C and D

Electronic Proposal | Pre-Bid Attendee | Drawings | Addendum No. 1| Revised Electronic Proposal |


SP17-001 SIDEWALK AND CURBRAMP CONSTRUCTION FOR CDBG/HUD GRANT

A  Mandatory Pre-Bid is scheduled for Monday November 13, 2017 at 9:00 a.m. in the 2nd Floor Conference Room, Room S213, South Building, 2317 S. Jackson Tulsa, Oklahoma Attendees arriving 10 minutes or more late will not be allowed to sign in.

SBE Goal: 6-10%
Pre-Qualifications: A and C

Electronic Proposal |Drawings | Pre-Bid Attendee |